home  | Contact  | Email Me  |          
Web Templates
:: Training / Testing
:: Audits / Surveys
:: Eye Screenings
:: Process Improvement
:: Level 3 Consultation
Information
:: Qualifications
:: Our Promise
:: Fees
:: Reference
 
Click here to apply now!
 
 
CONSULTANT'S QUALIFICATIONS

It is important for you to know the qualifications of your consultants. With over 25 years of solid experience with NDT, covering a wide variety of applications, you can be confident we can help you in your PT, MT, or RT application.

See My Training Record
See My Experience Record
See My Certification Record
See Specifications Familiar With

NONDESTRUCTIVE EVALUATION PERSONNEL QUALIFICATION RECORD
TECHNICAL TRAINING
Training Source
Course Subject
Hours
Date Completed
Harris Corp
PT & MT Testing
16
5/13/76
NDT Services,
St. Pet. FL.
PT Testing
8
4/28/78
NDT Services,
St. Pet.FLA.
MT Testing
8
9/28/77
E.I. Dupont
Radiography
40
2/23/79
American Society for Metals
Basic Metallurgy
12
weeks
2/9/79
Westinghouse- Tampa, FLA
PT Testing
20
5/21/79
Westinghouse- Tampa, FLA
MT Testing
20
7/20/79
Sperry- Columbus, OH
UT Testing
40
3/14/80
Sperry- Columbus, OH
UT Inspection of welds
24
3/19/80
Hobart- Troy, Ohio
Weld Inspection & Q.C.
8
weeks
4/20/80
Sperry- Columbus, OH
RT Testing
80
7/27/84
ASNT Sponsored
Radiation Safety
40
6/28/02
NONDESTRUCTIVE EVALUATION PERSONNEL QUALIFICATION RECORD
TECHNICAL EXPERIENCE
Experience
From
To
Type of inspection
ABA Industries / NDT Services
St. Petersburg, FL
Feb-76
Apr-79
Performed PT, MT and RT inspection on raw and machined casting and wrought parts and fusion welded SS., INCO, and AL assemblies. These assemblies were for GEAE & Pratt & Whitney jet engine components.
Westinghouse - Nuclear Div.
Tampa, FL
Apr-79
Sep-79
Performed PT, MT inspection on welded fabrication for nuclear power plant components (pressurizers and steam generators) alloys were both ferrous and stainless fabrications and tubing. Welds ranges from about 1/8th inch to 4" thick.
Bowser Morner Testing Lab
Dayton, Ohio
Sep-79
Apr-84
Performed PT, MT, and UT inspections on raw and machined castings, welded assemblies, constucted steel (I-beams, etc.) Welded fabrications, qualifying samples for certifying welders and material processes.Various components were tested for foundries, steel constructions, product reliability, weld engineering, heat treating and product safety encompasing many industries. Fabricated products were made of pipe, tubing, plate or sheet stock. I also performed CWI inspections.
A-Lab Analytical Lab
Dayton, Ohio
Apr-84
Dec-87
Performed PT, MT and RT inspections on raw and machined SS.INCO and AL alloy castings, and fusion welded tubing assemblies for aerospace. I also inspected alloy and composite components for space flight and ferrous/nonferrous components for the auto and racing industry. I also perform UT Thickness inspections. I was a Level 3 and trained, qualified and certified other NDT technicians as well and managed the NDT facility to meet customer requirements. Duties included writing procedures and process monitoring for compliance.
Elano Corp.
Dayton, Ohio
Dec-87
Sep-02
Peformed PT, RT and UT Thickness inspection on SS, INCO and TI welded and brazed components and assemblies for jet engine tubing configurations. As a level 3, I was responsible to train, qualify and certify 20-30 technicians in these NDT disciplines and perform audits of the processes, systems and personnel for specificaion and ISO compliance. I developed work instructions and procedures for the NDT processes. I was involved in borescope and hydro inspection processes as well.

Fisher Technical Services, LLC.


Current
Provide Consultation Services, see website
Nadcap Audit for NDT processes, Quality Systems, and Etching
NONDESTRUCTIVE EVALUATION PERSONNEL QUALIFICATION RECORD
QUALIFICATION AND CERTIFICATION
Method
Level
Cert Date
Certifying Agency
PT
PT
PT
PT
PT
PT
PT
PT
PT
PT
Basic
Basic
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
MT
MT
MT
MT
MT
2
2
1
3
3
3
3
3
3
3
3
3
2
2
3
3
2
3
3
3
3
3
2
2
1
3
3
7/26/76
4/28/78
5/21/79
7/1/84
7/2/87
4/28/88
1/4/91
Jul-96
4/29/98
5/14/99
7/1/84
Jul-96
2/27/79
7/27/84
8/29/84
7/2/87
12/14/87
1/7/88
1/4/91
7/1/96
4/29/98
5/14/99
9/28/77
9/28/78
7/20/79
7/1/84
7/2/87
Pratt & Whitney
NDT Services
Westinghouse
A-Lab Analytical Lab
A-Lab Analytical Lab
Elano Corp.
Elano Corp.
ASNT
GEAE
Boeing
A-Lab Analytical Lab
ASNT
Pratt & Whitney
A-Lab Analytical Lab
A-Lab Analytical Lab
A-Lab Analytical Lab
Elano Corp.
Elano Corp.
Elano Corp.
ASNT
GEAE
Boeing
NDT Services
NDT Services
Westinghouse
A-Lab Analytical Lab
A-Lab Analytical Lab
SPECIFICAION FAMILIARITY
Publisher

Specification
AMS
AMS
AMS
ASTM
ASTM
ASTM
ASTM
BOEING Aircraft
BOEING Aircraft
BOEING Aircraft
BOEING Aircraft
BOEING Aircraft
BOEING Aircraft
DOUGLAS
DOUGLAS
GE Aircraft Engines
GE Aircraft Engines
GE Aircraft Engines
GE Aircraft Engines
GE Aircraft Engines
MIL STANDARDS
MIL STANDARDS
MIL STANDARDS
MIL STANDARDS
MIL STANDARDS
MIL STANDARDS
MIL STANDARDS
NAS
Various Prime Specs

2635
2644
QPL-AMS-2644
E-1742
E-1417
E-1444
D-95
BSS 7039
BAC 5423
BSS 7041
BSS 7040
BSS 7600
BSS 7698
DPS 4.736
DPS 4.707
P3TF2
P3TF47
P29TF7
P3TF5
P3TF49
MIL-STD-410
MIL-STD-271
MIL-STD-1949
MIL-STD-6866
MIL-STD-6868
MIL-STD-2175
MIL-STD-453
410
P&W, Honeywell, Rolls, etc.



Copyright © 2011 Fisher Technical Services, LLC. [Contact Us]